AI Lever Console — Bending Fusion's Cost Curve

1costingFE · approximately 1 GWe net D-T tokamak · NOAK

How Can AI Bend the Fusion Cost Curve?

Explore hypothetical changes to a $109/MWh nth-of-a-kind (NOAK) plant with 7% interest and a 30-year life. The sliders show how assumed cost, schedule and availability changes affect plant-gate electricity cost. The scenario bands organize possible mechanisms and their evidence needs. They are not measured AI savings, probabilities or engineering limits. Computing, integration, qualification and other adoption costs are not included.

$108.9 /MWh
Lower-change scenario
Capital O&M Replacement
Move a lever to begin.
Lower-change scenario Qualification-dependent scenario Speculative scenario